Rotating Equipment Test
Motor test |
- Efficient tests in accordance with Regulation on Energy Efficiency Labeling & Standards for the three-phase induction motors of 0.75kW – 375kW
- Input/output, rpm, torque, efficiency, withstanding voltage, insulation resistance, and another performance test as per the request of the applicant
|
Generator test |
- Input/output, rpm, torque, efficiency, insulation resistance, withstanding voltage, and other test items as requested by a applicant for an individual unit of power generator
- Performance test of a power generator that is connected with an inverter
|
Inverter test |
- Input/output, efficiency, distortion factor, withstanding voltage, insulation resistance, and other test items as requested by a applicant for an inverter or a converter
|
Reducer test |
- The output and efficiency test of the motors with built-in reducers (geared motor) or a reducer that is attached to a motor
|
Electric tool test |
- Electrical product safety and performance tests for handheld or portable electric tools of which the rated input is 1.5kW or less
|
Energy regeneration device test |
- Safety and performance tests of the regenerative brakes used in apartments, buildings, hotels, office buildings, or hoists, etc.
|
Issues to be considered when receiving a request for a test of rotating equipment
Setting the testing method
- Check whether the test can be performed if the test involves an international standard, national standard, or organizational standard.
- Check the theoretical validity and possibility of the test in case of a custom standard of the applicant.
- If the customer fails to provide a testing method, negotiate with the applicant on the testing method before making a decision.
Availability of test equipment
- Conduct the test in our centers if the equipment is available with us.
- Conduct the test by dispatching the testers to the applicant facility if the test equipment is owned by the applicant.
- If the test equipment is held by a third party, check the availability of the test equipment with the third party before accepting a test request.
- A test must be conducted using a calibrated test equipment. (No test shall be conducted using non-calibrated testing equipment.
Environment Test and Endurance Test
- Check the specification of the test method and test equipment
- Consider the equipment and jigs suitable for the sample
The workflow of a test of rotating equipment
How to submit your application
- Fill out and submit an application form. Download
- A sample application form. Download
Visit the website of the responsible department
Click the button below to jump to the main webpage of the responsible department, where you can find the contact information of the officers in charge.